HarbourStack · Maritime · Denmark

Zero-downtime cloud migration for a port that never sleeps

A 24/7 port operations system moved from ageing servers to AWS, without stopping a single crane.

Client
HarbourStack
Services
Cloud & Migration, DevOps & Operations
Timeline
5 months · 2024
Stack
AWS, Terraform, Kubernetes, PostgreSQL, Grafana, ArgoCD

The challenge

The port's operations system ran on end-of-life hardware in a single server room. Any outage stopped ships from being loaded.

What we did

  1. Rebuilt the infrastructure as code in an EU AWS region across three availability zones.
  2. Moved data with continuous replication, then switched traffic in a rehearsed 40-second cutover.
  3. Set up monitoring and a 24/7 on-call rota with written response times.

The results

0 minDowntime during migration
41%Lower infrastructure cost
99.99%Uptime in the first year
“We braced for a difficult weekend. The cutover took less time than a coffee break.”
CTO, HarbourStack
Next case study

KlinikFlow

Patient booking for 120 clinics, GDPR from day one

Want results like these?

A free 30-minute call with a senior consultant. Honest advice, a clear next step.